HxGN MinePlan UG Long-Term Planning

All the tools an engineer needs to produce long-term plans for underground mines. The package includes MinePlan 3D CAD tools, MinePlan Stope Optimizer and MinePlan Activity Scheduler.

Main benefits

Includes MinePlan Stope Optimizer

The industry-standard algorithm for stope optimization allows for variation of economic and geometric parameters. It includes underground CAD design tools and an activity scheduler that understands sequence and precedences for underground activities.

Integrates with MinePlan 3D CAD tools

Not only can engineers evaluate and optimize stope designs, they can use MinePlan 3D CAD tools to create mine designs and activity-based schedules that account for sequence and precedences for underground activities.

CPLEX optimization engine for stockpile and blending

The built in CPLEX optimization engine ensures that stockpiling and blending considerations are accounted for. And reporting is straightforward using the built in Advanced Reporting and Charting (ARC) technology.

Learn more about Basis Modeling

Basis Modeling is a set of routines for creating and manipulating surfaces and solids, as well as routines for building, managing, and basic interpolation of 3D block, stratigraphic, and gridded surface models.

Introducing HxGN MinePlan Stope Optimizer

Using constraints and design parameters, Stope Optimizer provides the optimal stope shape design to maximize the value of an orebody. The outputs are suitable for use in strategic and tactical planning.

Tactical short-term planning the Hexagon way

Applied tactically, Hexagon’s short-term planning software can reap rich operational rewards, explains Technical Services’ specialist, Javier Castaneda in a video interview.

 

MinePlan release improves scheduling tools

Among the exciting new features in the latest release of MinePlan is a new, intuitive interface for the Reserves tool, which benefits users of MinePlan Activity Scheduler and MinePlan Scheduler Optimizer.

Tell us more